top of page

Install-And-Forget-Kernel Silo Heaters

Mill Managers are usually very busy and are swamped with many issues and problems to resolve on a daily basis. To be repeatedly confronted by the marketing department and the Palm Kernel buyers on the high moisture content of palm kernel dispatched is an unpleasant distraction and reflects badly on your lack of process control. With the current prices of palm kernel, there is more urgency to resolve this problem once and for all, permanently. In this Case Study, I share my experience on how I resolved this problem.


Install-And-Forget-KernelSilo-Heaters
.pdf
Download PDF • 14.37MB

153 views9 comments

Recent Posts

See All

There are many young graduate Engineers including Palm Oil Mill Engineers out there, that are in a predicament about how one goes about to become a Professional Engineer (PE) in Malaysia. In a world w

In our first Case Study posted on the site, we dealt with the necessity of balancing the Fuel/Steam/Power requirements of the mill to ensure smooth operation. Another posting under “Ask Your Members’

bottom of page